How long does it take to fit a kitchen?

The fitting itself is usually measured in days, not weeks, but the full job depends on what else needs doing around it.

By Ash Wood Joinery · Runcorn

Green shaker kitchen with island

The fitting

For a straightforward kitchen where the walls, floor and services are ready, the joinery is often done in a few days. One customer's Howdens kitchen was fitted in three solid days.

Before the fit

If walls are coming out, the room is being replastered, or electrics, gas and plumbing need moving, that work happens first. Ash organises his own plasterer, electrician and gas engineer so it runs in the right order.

After the fit

Worktops made to measure, such as quartz, are templated once the units are in and fitted later. Tiling, splashbacks and decorating then finish the job.

What slows it down

Late or damaged deliveries are the most common cause. Check everything when it arrives, so missing or broken parts can be reordered straight away.

Living without a kitchen

Set up a temporary area with a kettle, microwave and fridge in another room. The team clean up at the end of each day so the house stays usable.

Want a price for your job?

Send Ash a few photos and rough sizes and he'll come back to you.

Got a job that needs doing?

Let's talk

An informal chat gets the ball rolling. Call Ash, or send a few details and he'll get back to you.

07561 813365

Runcorn · Widnes · Warrington · Frodsham · Cheshire · Merseyside